午夜成人影视在线-午夜成人影院催经视频-午夜成人影院免费-午夜成人影院污-午夜成人影院在线-午夜成人影院在线观看-午夜成人在线-午夜成人在线播放

濟南誠耐金屬制品有限公司

濟南誠耐金屬制品有限公司

不斷發展技術力量、完善的設計服務團隊,真誠為您提供的服務

咨詢熱線
于經理15194166167
15990909037

聯系我們

企業名稱:濟南誠耐金屬制品有限公司

聯系人:于經理

電話: 15990909037

電話: 15194166167

地址:山東省濟南市歷城區小清河南路8288號

當前位置:首頁 »資訊中心 » 新聞資訊

濰坊電梯門套安裝流程怎么檢驗?

來源:http://m.giayee.cn/ 瀏覽:0發表時間:2025-06-13

  電梯門套作為電梯井道與建筑結構的銜接部件,其安裝質量直接影響電梯運行安全與建筑美觀。濰坊地區因氣候特征與施工規范差異,門套安裝檢驗需結合地域特性制定專項方案。本文從材料驗收、安裝精度、功能測試三大環節,詳細闡述標準化檢驗流程。

  As a connecting component between the elevator shaft and the building structure, the installation quality of the elevator door frame directly affects the safety of elevator operation and the aesthetics of the building. Due to differences in climate characteristics and construction standards in Weifang area, a special plan for door frame installation inspection needs to be developed based on regional characteristics. This article elaborates on the standardized inspection process from three major aspects: material acceptance, installation accuracy, and functional testing.

  一、材料進場檢驗

  1、 Material entry inspection

  材質與規格核查

  Material and specification verification

  檢查門套材質證書,確認不銹鋼板厚度≥1.2mm,石材吸水率≤0.5%,復合材料防火等級達B1級。某項目因使用厚度不足的不銹鋼門套,導致變形率超標,后更換為1.5mm厚板材后通過驗收。

  Check the material certificate of the door frame, confirm that the thickness of the stainless steel plate is ≥ 1.2mm, the water absorption rate of the stone is ≤ 0.5%, and the fire rating of the composite material reaches B1 level. A certain project had an excessive deformation rate due to the use of stainless steel door frames with insufficient thickness, which were later replaced with 1.5mm thick plates and passed the acceptance inspection.

  核對門套尺寸與電梯井道預留洞口匹配度,寬度偏差需控制在±2mm以內,高度偏差≤3mm。

  Check the matching degree between the size of the door frame and the reserved opening in the elevator shaft. The width deviation should be controlled within ± 2mm, and the height deviation should be ≤ 3mm.

  外觀質量檢查

  Appearance quality inspection

  不銹鋼門套表面應無劃痕、凹坑,鏡面拋光處理的光澤度≥600Gu。

  The surface of the stainless steel door frame should be free of scratches and pits, and the glossiness of the mirror polishing treatment should be ≥ 600Gu.

  石材門套需檢查色差與裂紋,采用色差儀測量ΔE值≤1.5,敲擊聽聲排查空鼓。

  The stone door frame needs to be checked for color difference and cracks. A colorimeter should be used to measure the Δ E value ≤ 1.5, and knocking and listening should be used to check for hollowing.

  二、安裝過程檢驗

  2、 Installation process inspection

  基層處理驗收

  Grassroots treatment acceptance

  確認井道墻體垂直度≤3mm/2m,平整度≤2mm,使用2米靠尺與塞尺檢測。某老舊小區改造項目因墻體傾斜,導致門套安裝后縫隙不均,后經鑿平處理達標。

  Confirm that the verticality of the shaft wall is ≤ 3mm/2m and the flatness is ≤ 2mm, and use a 2-meter ruler and a feeler gauge for inspection. The renovation project of an old residential area resulted in uneven gaps after the installation of door frames due to the inclined walls, which were later chiseled and leveled to meet the standards.

  檢查防潮層施工,確認聚乙烯薄膜搭接寬度≥100mm,膠粘劑涂抹均勻。

  Check the construction of the moisture-proof layer, confirm that the overlap width of the polyethylene film is ≥ 100mm, and apply the adhesive evenly.

  門套定位與固定

  Door frame positioning and fixation

  采用激光投線儀校準門套垂直度與水平度,偏差需≤1mm。某商業綜合體項目因未使用激光定位,導致門套傾斜引發電梯門碰撞故障。

  The verticality and levelness of the door frame are calibrated using a laser projector, with a deviation of ≤ 1mm. In a commercial complex project, the door frame tilted due to the lack of laser positioning, resulting in elevator door collision failure.

  檢驗固定點間距,膨脹螺栓錨固深度≥50mm,焊接部位需做防銹處理。

  Check the spacing between fixed points, anchor the expansion bolt to a depth of ≥ 50mm, and perform rust prevention treatment on the welding area.

20220920052426908.jpg

  接縫與收口處理

  Seam and closing treatment

  檢查門套與墻面縫隙,填充發泡膠需密實無空洞,硅酮密封膠施打寬度≥8mm,表面光滑無流掛。

  Check the gap between the door frame and the wall, fill the foam adhesive tightly without voids, apply silicone sealant with a width of ≥ 8mm, and ensure a smooth surface without sagging.

  陰陽角拼接處需采用45°斜角對接,拼縫誤差≤0.5mm。

  The joint between the yin and yang corners should be connected at a 45 ° angle, with a joint error of ≤ 0.5mm.

  三、功能與安全測試

  3、 Functional and safety testing

  開關門順暢性測試

  Smooth door opening and closing test

  模擬電梯運行1000次,檢查門套與轎門間隙是否恒定,間隙偏差≤2mm。某醫院電梯因門套變形導致轎門卡阻,后增設限位裝置解決。

  Simulate elevator operation 1000 times, check whether the gap between the door frame and the car door is constant, with a gap deviation of ≤ 2mm. A hospital elevator had a door frame deformation causing the car door to jam, and later added a limit device to solve the problem.

  測試門鎖觸點接觸可靠性,確認門閉合時電阻≤0.1Ω。

  Test the contact reliability of the door lock contacts and confirm that the resistance is ≤ 0.1 Ω when the door is closed.

  抗沖擊與耐候性驗證

  Impact resistance and weather resistance verification

  對石材門套進行落球沖擊試驗,500g鋼球1米高度自由落體,表面無裂紋。

  Conduct a drop ball impact test on the stone door frame, with a 500g steel ball freely falling from a height of 1 meter and no cracks on the surface.

  模擬濰坊夏季高溫環境,將門套置于60℃恒溫箱72小時,檢查變形率≤0.2%。

  Simulate the high temperature environment in Weifang during summer, place the door frame in a 60 ℃ constant temperature box for 72 hours, and check that the deformation rate is ≤ 0.2%.

  防火與防煙性能檢測

  Fire and smoke prevention performance testing

  核查防火門套燃燒性能報告,確認耐火極限≥1小時。

  Verify the combustion performance report of the fireproof door frame and confirm that the fire resistance limit is ≥ 1 hour.

  使用煙霧發生器測試門套密封性,煙霧滲透率≤5%。

  Use a smoke generator to test the sealing of the door frame, with a smoke penetration rate of ≤ 5%.

  四、驗收文件與標識管理

  4、 Acceptance documents and identification management

  資料完整性審查

  Data integrity review

  收集材料合格證、檢測報告、隱蔽工程記錄,確保可追溯性。某安置房項目因缺失焊接記錄,導致驗收延期一周。

  Collect material qualification certificates, testing reports, and concealed engineering records to ensure traceability. Due to the lack of welding records, the acceptance of a certain resettlement housing project was delayed by one week.

  繪制門套安裝位置圖,標注關鍵尺寸與固定點坐標。

  Draw a diagram of the installation position of the door frame, and mark the key dimensions and fixed point coordinates.

  標識與維護指導

  Identification and maintenance guidance

  在門套內側粘貼維護標簽,注明清潔方法與禁令事項。

  Stick maintenance labels on the inside of the door frame, indicating cleaning methods and prohibited items.

  提供石材養護周期表,建議每半年進行結晶硬化處理。

  Provide a stone maintenance cycle table, and it is recommended to perform crystallization hardening treatment every six months.

  濰坊電梯門套安裝檢驗需構建“材料-工藝-功能”三位一體管控體系。通過精準測量、嚴格測試、完整存檔,可顯著提升安裝質量與長期可靠性。隨著BIM技術的應用,未來的門套安裝將實現數字化模擬與實時監控,為電梯工程安全提供更堅實的保障。

  The installation inspection of elevator door frames in Weifang requires the establishment of a "material process function" integrated control system. By precise measurement, rigorous testing, and complete archiving, installation quality and long-term reliability can be significantly improved. With the application of BIM technology, the installation of door frames in the future will achieve digital simulation and real-time monitoring, providing a more solid guarantee for elevator engineering safety.

  本文由濰坊電梯門套友情奉獻.更多有關的知識請點擊:http://m.giayee.cn我們將會對您提出的疑問進行詳細的解答,歡迎您登錄網站留言.

  This article is a friendly contribution from Linyi Elevator Door Frame Installation For more information, please click: http://m.giayee.cn We will provide detailed answers to your questions. You are welcome to log in to our website and leave a message

主站蜘蛛池模板: 东京热男人的天堂 | 91久久偷偷做嫩草影院 | 麻豆精品A片免费观看 | 亚洲不卡无码高清视频 | 激情午夜成人影院无码在线 | 无码人妻丰满熟妇**网站牛牛 | 你懂的精品 | 国产午夜无码视频在线观看 | 美国十次午夜成人影院 | 午夜精品| 特级西西444www无码视频免费看 | 国产 AV 白浆 喷水 | 国产黄在线 | 亚洲AV无码久久久久久 | 成人做爰A片免费看奶头 | 久久久久久久无码 | 91国内精品自线在拍白富美 | 久久免费视频中文字幕99 | 精品人妻无码一区二区三区不卡 | 无码少妇好爽 | 91精品久久久久久久久中文字幕 | 91精品国产一区二区无码思瑞 | 97超碰人人 | 国产精品一区二区三区不卡 | 黃色A片三級三級三級免费看欲兔 | 热播无码视频-高清无码视频大全-免费无码视频在线观看-第1页-A62AV | 国产91玉足脚交在线播放 | 国产成人精品三级麻豆 | 极品少妇一区二区三区 | AV一区二区在线观看 | av无码一区 | 182tv午夜福利| 2025国产亚洲精品午夜 | 高清av无码 | .91精品久久久久久久久中文字幕 | 极品少妇XXXX精品少妇偷拍 | 成人毛片小说卡一卡二 | 乱伦免费视频 | 91精东麻豆| 亚洲色网那个色色色 | 91视频 一区|